Product coding content is determined by the online quality inspection or production supervisor, coding personnel is responsible for coding and test printing, coding format and content should meet the corresponding product coding requirements.
Before the coding starts, the staff of the code inspection post is responsible for the confirmation and review, if there is any doubt, timely feedback and consultation with the online quality inspection or production supervisor, and truthfully record the printing information.
In the production process, if there is an anomaly, the personnel of the code inspection post will give feedback in time: slight anomaly, but the code is complete, and timely notify the online quality inspection and production supervisor; If the inkjet code is incomplete or the equipment is faulty, stop the car immediately, notify the relevant personnel to repair, and inform the online quality inspection and production supervisor 2.
Inkjet machine maintenance and maintenance:
During the production process, the relevant personnel check the operation status of the equipment every hour; Online quality inspection and production supervisor regularly check the printing condition. If any exception occurs, handle it in time.
If the code personnel take a break or leave temporarily, they should communicate with the equipment supervisor in time, and the equipment supervisor will contact others to take over the corresponding work.
The code personnel do not hand over the work, leave without authorization, and the responsibility for the delay in production shall be borne by the code personnel, and the equipment supervisor shall bear the management responsibility 2.